JMB/MC EXCELLENT MANAGEMENT RECOGNITION PROGRAM IN 2024

VACANT ADVERTISEMENT OF MPSEPANG PREMISES IN OCTOBER 2024

Applications for renting MPSepang premises for the month of October can be made online at https://epharta.mpsepang.gov.my/. Any questions can contact Mr. Fauzan Bin Kahar or Mimie Shazreen Mohamad Shah on 03 8319 0200.

QUOTE THE PRICE OF DISPOSAL OF MOVABLE ASSETS

Offers are invited from companies or individuals interested in purchasing the following assets:

  1. SH/MPSepang/JKP/179/2024 – PROTON PREVE (BMT 1863)
  2. SH/MPSepang/JKP/180/2024 – PROTON SAGA FL 1.3 (BMD 6702)
  3. SH/MPSepang/JKP/181/2024 – PROTON PROTON SAGA (BLP 3739)
  4. SH/MPSepang/JKP/182/2024 – PROTON SAGA FL 1.3 (BLP 3735)
  5. SH/MPSepang/JKP/183/2024 – PROTON SAGA (BLL 9670)
  6. SH/MPSepang/JKP/184/2024 – PROTON SAGA FL 1.3 (BMD 6703)
  7. SH/MPSepang/JKP/185/2024 –  LORI TRIPPER ISUZU (BEM 8546)
  8. SH/MPSepang/JKP/186/2024 – VAN HIACE, TOYOTA (BGK 6935)
  9. SH/MPSepang/JKP/187/2024 – BOX TRUCK HICOM (BJX 4566)
  10. SH/MPSepang/JKP/188/2024 – LORI 1 TON, ISUZU (BLN 732)
  11. SH/MPSepang/JKP/189/2024 – LORI TRIPPER HICOM (BGR 3400)

2024 STRATIFIED BUILDING MANAGEMENT SEMINAR

The Building Commissioner Unit (COB) will hold a Strata Management Seminar for owners / occupiers of strata buildings, JMB / MC committee members, developers, property managers, land surveyors and government agencies such as Local Authorities throughout Malaysia.
Time : 8.30 am – 4.30 pm

COMMUNITY GARDEN AWARD @SEPANG 2024

VACANT ADVERTISEMENT OF MPSEPANG PREMISES IN AUGUST 2024

Applications for renting MPSepang premises in August 2024 can be made online at https://epharta.mpsepang.gov.my/. Any questions can contact Mr. Fauzan Bin Kahar or Mrs. Mimie Shazreen Binti Mohamad Shah, 03 8319 0200, Valuation And Property Management Department.

OBJECTION SESSION OF THE NEW ASSESSMENT TAX VALUE LIST

NEW MODEL OSC 3.0

Continuous improvement to the government service delivery system and aspects of progress control requires a comprehensive review to be carried out on the existing processes and procedures of technical agencies, not limited to PBT only, but on all internal and external technical agencies that are members of the OSC Committee. The effectiveness and efficiency of the officers in processing applications for permits, approvals or support is measured through the number of interactions (procedures) imposed on investors, the length of time taken to process all procedures and the costs imposed on investors before permits, approvals or support are issued. The number of procedures, the time taken to process the application and the cost incurred to complete the application serve as a yardstick for the level of domestic regulation imposed and its impact on investors. This measurement covers the entire construction stage, from the pre-construction stage to the post-construction stage, which is after the utilities are connected and the Certificate of Completion and Compliance (CCC) is issued.

OSC’s New Model focuses on 6 main construction processes, namely pre-negotiation, consideration of proposed development plans, on-site construction approval notification, interim inspection, final inspection and CCC deposit. Legal requirements are implemented as provided, while procedures that do not need to be dropped while procedures that need to be held, strengthened and streamlined.

Agency Manual osc_3.0

Application Manual osc_3.0

DOWNLOAD iSEPANG MOBILE APPLICATION

iSEPANG is a mobile application from the Sepang Municipal Council that includes the latest information about the Sepang district, online booking and payment facilities, online review and payment of assessment and rental taxes as well as various information related to the Sepang Municipal Council without having to go to the Service counter we. Click here for more.

INTEGRITY CHARTER & SEPANG MUNICIPAL COUNCIL INTEGRITY COMPLAINT CHANNEL

Integriti